[1]
“Selection of the most Suitable Site for Dam Construction in Pishdar (AHP). District Using the Analytical Pyramid Process (AHP)”, RJH, vol. 13, no. 1, pp. 765–792, Mar. 2026, doi: 10.26750/d483qr98.